Day 1 & 2- STARTING WITH THE BEDROOMS
We started our rehab with the 2 bedrooms since I have to
have one totally completed by 16 June when my girlfriend moves down. There is really nothing interesting about
this work other than the discovery of the carpenter’s signature on the back of
some trim pieces- I guess this is pretty common as we have found similar items
at other houses we have remodeled. I
spent Sunday ripping up all of the old carpet which had been ruined by the
former owners dogs/cats/warthogs/etc. The oak wood floors underneath seem to be
in good shape and should finish up really nicely with a dark stain and a glossy
finish;
Here is a picture of the backside of the new guest closet
and the framing of the eventual new laundry closet;
The ceilings in the bedrooms (and the whole house) are
covered with an ugly texture so I spent Tuesday drywalling over the top to give
it a nice smooth look which we will eventually finish with crown moulding. I forgot to take pictures of this area but
should have some “before/during/after” shots up by mid-week.
There weren't any closets in any of the bedrooms before you started, right?
ReplyDeleteOriginally there were closets however they eliminated the one in the master bedroom and cut out half of the one in the guest bedroom to make the stairway to the second floor- I found the outline of the orginal pull chain ladder in the hallway that used to give access to the second floor.
ReplyDelete