BATHROOM UPDATE: 75% COMPLETED!

We grouted the tub surround this morning and moved on to tackle some odds & ends in the afternoon.  We finally seamed in the wood flooring to cover the other voids in the dining room- here is a before and some after’s;



We also added a built-in linen closet in the bathroom.  When we bought the house there was a closet in the bathroom however 50% of the space was taken up by HVAC ducts coming up from the basement.  While I unfortunately do not have any “before” pictures of this space, the owner had nailed together some 2x4’s to make a single shelf in the area.  We decided to utilize as much of the space as possible- we built a deep area for towels, etc. and filled in the tighter area with space for shampoo bottles, etc..  When looking at the photos please note that we used a shelf pin jig which creates holes in both sides of the cabinet to allow for pins to be installed and the shelves to be rearranged at any time.  We stained it the same color as the floor although the door will be white like the rest of the trim;

We finished the day by putting the floor down in the bathroom.  While I wanted to drop in mosaic keys to match the shower border, I was overruled by CC and my dad so we laid it out in a staggered pattern;

Here is a shot of the grouted tub surround BEFORE caulking & cleaning- the toilet is in the tub because we were laying the floor;

We purchased the easy “cool” stuff for the bathroom at the end of the day- vanity, mirror, lights, towel bars, etc...  Our goal for tomorrow will be to finish the walls/ceiling, install the vanity and grout the floor.  Hopefully the bathroom will be completely done by noon on Friday!

7 comments:

  1. love the linen closet in the bathroom, it looks super. EC

    ReplyDelete
    Replies
    1. Thanks- the adjustable shelves really maximize the space.

      Delete
  2. Are you still calling this bathroom Little ReRe's Salon?

    ReplyDelete
    Replies
    1. Are you making a return trip to NashVegas or what?!?

      Delete
  3. Bathroom looks amazing. Bet you guys can't wait to have it done! Especially CC!

    ReplyDelete
    Replies
    1. Sorry for the delay in response! Yes, CC is happy the bathroom is finished- she filled up the new cabinets as soon as the stain was dry. In the last couple of days she has added a matching shower curtain with brushed nickel rings, a matching TP holder, had me install a matching double towel bar and she is on a quest to find the perfect brushed nickel round mirror!

      Delete
  4. This comment has been removed by the author.

    ReplyDelete