Thursday, June 27, 2013

CINCINNATI FIREPLACE
We remodeled a great room in Cincinnati and the focal point involved covering a dated fireplace with a stacked ledgestone veneer.  Here are some before, during and after’s;

Before

During




After



Tuesday, June 18, 2013

CINCINNATI PROJECT #25
As I mentioned, my sister is converting a guest room into a baby room in preparation for her July due date.  She found a baby bed at a big box store and asked me if I could make a handmade version using oak.    Here are the results;
Before (rough lumber from the lumber yard)

 During (after cutting/planning/routing)

After (stained/poly before linens/etc)


After




Monday, June 10, 2013

Cincinnati Fire Pit
My dad put on a ground level deck in Norwood a few weeks ago and added space for a 3’x3’ fire pit in the middle.  I faced the pit with a stacked ledgestone veneer and added a cap.  Here are before and afters;


Tuesday, May 28, 2013

Small Cincinnati Project
My sister is converting a guest bedroom into a baby room.  She wanted accessible space for diapers/toys/etc. so we cut down the closet and made a built in cabinet with adjustable shelves.  Here is a before, during and after- note the matching trim which was pulled/reused from the interior of another closet;
Before

During (Cut Out)

During (Unfinished Cabinet Install)


After

Cincinnati Project #6
I have a few other Cincinnati projects that I have yet to take “after” pictures and post.  In the meantime, here is a recent bathroom remodel;
Before



 After





NASHVILLE DECK & FENCE
Since the summer season has started, we finally put on a back deck in Nashville.  Here are some before and afters;
BEFORE



AFTER









Monday, March 4, 2013


CINCINNATI PROJECT #1

While we search for the next house in Nashville, I have been spending some time in Cincinnati working on a few smaller projects.  My first project was a complete bathroom remodel in the Norwood area.  The house was built in the 1950’s and had a dated bathroom which was plagued with slow drains and an inoperable shower.  I spent the first couple days ripping out the tile walls, tub and plaster.  The next couple days were spent running new plumbing and electric.  We put in the new tub, backer board and drywall last Friday and tiled on Saturday.  After taking Sunday off, we spent Monday grouting and resetting the toilet.  We built the built in cabinets and installed trim on Tuesday and painted on Wednesday.  Thursday was spent on final touchups and clean up.

Here are the before and after pictures.  I decided to do the pictures as a progression rather than all of the “befores” together, etc so let me know what you think.